Define the alternative
Start by describing what would plausibly happen without the proposed activity. For a planting project, that means considering the land’s likely use and vegetation trajectory. For a clean-cooking project, it includes the relevant baseline technology and fuel use.
Keep the baseline and additionality arguments consistent. An optimistic carbon projection does not by itself demonstrate that the project is additional.
Apply the relevant test
The assessment procedure depends on the methodology. For example, Verra’s VT0008 tool addresses alternatives, barriers, investment and common practice. Verra states that methodologies may use that tool, parts of it, their own procedures or another tool.
Do not treat one generic checklist as applicable to every project. Identify the methodology and version first, then record which tests apply and what evidence each needs.
Build an evidence record
The feasibility stage should identify both the information already available and the work still needed. Relevant evidence may include:
- The proposed activity, its timing and credible alternatives.
- Applicable legal requirements and the project’s relationship to them.
- Costs, revenues and financing assumptions where an investment analysis is required.
- Evidence of material barriers and how the project addresses them.
- Comparable activities and local conditions relevant to common-practice analysis.
Be clear about unresolved questions
A weak evidence base should be visible in the recommendation. Separate a documented finding from an assumption, and explain which missing information could change the result.
Early assessment can help determine whether to proceed and what to investigate next. Formal validation and registration are separate processes; a positive feasibility conclusion does not replace them.