Choose an initial eligibility check or a full desktop feasibility study. Both document the findings and the work needed before development. Scope and payment terms are confirmed in writing.
Initial assessment
Eligibility Check
$500
An initial assessment of eligibility, barriers and further information needed. Delivered in 2–3 business days after complete intake.
Fee refunded if Green Earth Group partners with you to develop the project
Report contents
Checks the project type against the methods the platform runs: tree planting on land without forest (ARR) under VM0047.
Says plainly when a project belongs to a family we cannot study yet, before you pay.
Reads every part of the boundary, with its role (planting, agroforestry, preservation, reference).
Maps the land cover inside it. A boundary check does not establish legal ownership.
Forest-cover history (the 10-year rule) from Hansen Global Forest Change.
Built-up land from GHSL, water and wetland from JRC, and slope from an elevation model.
One eligible-area figure, used in every later section.
Describes the climate and terrain the trees would grow in.
Flags constraints that matter for establishment and survival.
Screens each species for growth form, rainfall, dry season, altitude and invasive status.
With no species given, builds a shortlist from registered ARR projects in the same ecoregion and says where each candidate came from.
Gross removals over the project period from IPCC 2019 Tier 1 rates for the site’s ecological zone.
Shows the assumptions and the inputs that move the estimate most.
Non-permanence risk reserve (NPRR), uncertainty and leakage, each as a line in a table.
Issuance-postponement curves: credits that arrive later, not credits that vanish.
A plain recommendation: proceed, proceed with conditions, or reconsider.
The fieldwork, legal checks and consultation needed before project design.
Desktop study; further validation requirements identified.
The core assessment is performed using satellite data and regional databases. Where material data gaps exist that would affect the outcome, we identify the specific field validation steps required before development or certification can proceed.
Separate engagement
Project Development
By arrangement
Full development support and, for qualifying projects, capital co-investment.
We consider co-investment in projects with sound project economics, low permanence risk and a clear path to first credit issuance. Assessment is made following the full feasibility study.
On capital investment
For projects that demonstrate strong fundamentals in the full feasibility study, we consider direct co-investment as a project partner. This is assessed on a case-by-case basis and is not guaranteed.
You can start with either. The eligibility check ($500) is a sensible first step if you are uncertain whether your land qualifies — it gives you an initial recommendation before commissioning the full study. If you already have a reasonable degree of confidence, you can proceed directly to the full feasibility study.
Use it to assess whether to proceed and to inform discussions with your team, investors and development partners. The report includes the eligible area, the carbon estimate, the gross-to-net table, assumptions and next steps. It does not replace a Project Design Document, independent validation or due diligence.
For projects that pass the full feasibility study, we offer to support or lead the complete development process — from Project Design Document through certification, credit sales, and ongoing monitoring. For qualifying projects, we also consider co-investment. This decision is made on a case-by-case basis following the feasibility study; we do not commit to investment without that analysis.
No. You provide basic information about your land and project intent. Our team carries out the desktop analysis. We will follow up if additional information is needed.
If the eligibility check concludes your land is unlikely to support a viable carbon project, we will provide a clear written explanation of the barriers identified. The $500 fee is non-refundable at this stage, and the report documents the reasons for the recommendation.
If the full feasibility study concludes that your land does not qualify, we refund 50% of the $7,500 fee. If Green Earth Group partners with you to develop the project, the study fee is refunded.
Tree planting on land without forest: reforestation, agroforestry and ARR (afforestation, reforestation and revegetation), following VM0047. Other project families, such as REDD+, blue carbon or cookstoves, are not studied yet. We work globally.
Start with an eligibility check
Begin with the $500 eligibility check — an initial assessment in 2–3 business days after complete intake.