Insights · For landowners

Can I sell carbon credits from my land? A plain answer

Can you sell carbon credits from your land? Sometimes, yes, but not by owning trees or land alone. Credits come from a registered project that adds carbon, checked by independent auditors and issued years after the work starts. This guide is for landowners, farmers and communities, mostly in tropical countries, who are thinking about planting trees.

Feasibility.Earth team, Green Earth Group · Updated

Can I sell carbon credits from my land? The short answer

A carbon credit represents one tonne of carbon dioxide removed or avoided. It is issued by a registry, such as Verra's Verified Carbon Standard (VCS), to a registered project. Land does not earn credits by existing. A project earns them by changing something, measuring the change, and having it checked.

For most landowners in the tropics the realistic route is tree planting on land that is not forest today: afforestation, reforestation and revegetation (ARR), including agroforestry. Verra's methodology for this is VM0047. If you own standing forest, the usual routes are other project types such as REDD+ or improved forest management; VM0047 only covers enhancing forest not managed for wood products in the past ten years. We do not screen either.

A note on geography: forest-owner carbon programmes in the United States and Europe work under different rules and markets. This guide does not cover them.

What land qualifies for a tree-planting project

Three things decide whether land can carry an ARR project:

  1. It is not forest now (the case our screenings cover). VM0047 v1.1 also lets area-based projects add carbon to forest that has not been managed for wood products in the past ten years, but most landowner projects plant open land. What counts as forest depends on thresholds for area, canopy and tree height. See the forest definition and the 10-year rule.
  2. It was not recently cleared to make way for the project. Standards look back about ten years so that nobody is paid for cutting trees in order to replant them.
  3. Trees would not come back on their own. Credits are only for carbon the project adds. Land that is already regrowing may earn little.

Practical land matters too: villages, roads, water and very steep slopes drop out. On the real sites we have screened, the share of eligible land ranged from over 99% on open savanna to 0.1% on a coastal mangrove site, and under 2% on land that was already rainforest.

Farming does not have to stop. Under VM0047, scattered trees on farmland, at most 50 per hectare, with farming continuing, can use a simpler census-based approach. More in agroforestry carbon credits.

How much carbon a hectare can remove

The honest answer starts with climate. The IPCC publishes default growth rates for new forest by ecological zone. Converted to tonnes of CO2 per hectare per year, the above-ground rates for young stands (up to 20 years old) in Africa that appear in our studies look like this:

IPCC 2019 Tier 1 default removal rates, young stands in Africa (gross, before any deduction)
Ecological zonetCO2e per ha per yearPer 100 ha per year
Tropical shrublands (dry savanna)0.775about 78
Tropical moist deciduous forest4.998about 500
Tropical dry forest6.721about 670
Tropical mountain system9.478about 950
Tropical rainforest13.097about 1,310

That is a more than fifteenfold spread between the slowest and the fastest zone. These are gross screening figures: what the trees might take up on average. They are not credits. Before anything can be issued, the standard subtracts the baseline, leakage, an uncertainty deduction and a share for the buffer pool. Read gross vs net carbon credits for each deduction, and carbon sequestration per hectare for all zones.

Real numbers show how big the gap can be. In our anonymised sample study, a dryland site in East Africa, 1,608 eligible hectares gave a gross screening estimate of 69,779 tCO2e over 40 years, 1.085 tonnes per hectare per year. After deductions the net screening estimate was −2,976 tCO2e: below zero. Leakage, the grazing displaced by the trees, was the largest deduction at 55,310 tCO2e, because the land use was not given and the mapped crops and rangeland counted as displaced. Telling the screening how the land is used today, and where that use would go, changes the answer more than anything else. See leakage in ARR projects.

Why most landowners work with a developer

A carbon project has fixed costs that do not shrink with the area: the project description, field inventories, validation and verification by an accredited auditor, registry fees, and monitoring for decades. Then there is the largest cost, growing and protecting the trees. Under the VCS Standard, land-use projects such as tree planting must have a crediting period of at least 20 years.

A project developer brings the methodology knowledge, the up-front money and the buyers, and usually takes a share of the credits or revenue in return. Small landholdings are often combined into one grouped project. Before you sign anything, make sure the agreement says who holds the carbon rights, how revenue is shared, who pays which costs, and what happens if the project ends early. The stages and who does what are in carbon project development.

What to look for in an offer

If a developer or buyer approaches you, the details of the agreement matter more than the headline. A few questions help:

  • Who holds the carbon rights, and for how long? A tree-planting project runs for its whole crediting period, at least 20 years under the VCS Standard. Know what you are committing the land to.
  • How is revenue shared, and when? A share of credits sold after verification is different from a fixed fee, and both are different from a loan against future credits.
  • Who pays if trees die? Fire, drought and grazing happen. Ask who replants, and how losses affect your share.
  • Can you keep farming? Displacing grazing or crops costs credits through leakage, and it costs your household too. Agroforestry can keep both.
  • Has anyone checked the land? An offer made before anyone has looked at forest history, eligible area and growth rates is an offer made on hope.

Land rights, carbon rights and consent

No project gets far without clear rights. The VCS project description must justify how project ownership was established, with evidence attached. It must also describe how stakeholders were consulted and, where Indigenous Peoples, local communities or customary rights holders are concerned, how their free, prior and informed consent (FPIC) was obtained, and how benefits are shared.

In many countries the carbon rights on customary or communal land are not obvious, and some host governments have their own rules on carbon projects. These are questions for lawyers and for the community, not for a map. No desktop study can settle them.

How long it takes

Plan in years. Design, field data, consultation, validation and registration come before the first monitoring period. Young trees remove little carbon in their first years, and credits are only issued after removals have happened and been verified. Some projects raise money earlier through investors or forward sales, but that depends on the project and its partners. Anyone who promises a fixed income per hectare before the land has even been checked is guessing.

How to sell carbon credits from your farm or land: the steps

  1. Check eligibility

    Is enough of the land eligible for ARR? A desktop screen answers this from satellite data. Our Eligibility Check costs $500 and takes 2–3 business days.

  2. Test the carbon case

    Species, gross removals, deductions and risks. A carbon feasibility study is the go or no-go point before real money is spent.

  3. Settle rights and consent

    Land and carbon rights, benefit sharing, and free, prior and informed consent from everyone concerned.

  4. Find a development partner

    Agree who designs, finances, plants, monitors and sells, and on what terms.

  5. Design, validate, register

    Field inventories and the project description, audited by an accredited validation body, then registration.

  6. Plant, monitor, verify

    Credits are issued after each verification, minus the buffer contribution, for the length of the crediting period.

If you are a landowner or a community organisation, our page for landowners and communities explains what we need from you to run a check: a boundary file, what each part of the land is for, and roughly when planting would start.

Frequently asked questions

Possibly, but not directly from the land as it is. Credits come from a registered project that measurably adds carbon, for example by planting trees on land without forest. The land must be eligible, the project must follow a methodology, an independent body must validate it, and credits are issued only after removals are verified. Most landowners do this with a project developer.

Sources

Start with one question: is your land eligible?

The Eligibility Check maps forest history, built-up land, water and slopes inside your boundary and gives one eligible-area figure. $500, 2–3 business days from a complete intake.